 Troop #49 repaired wash-outs on the Upper East Gate road.
|
 Troop #116 built culverts and repaired the Swamp Trail at the east end of West Gate.
|
 Troop #28 began the new East gate latrine project and prepared the East gate road for blading.
|
 Troop #38 launched and anchored the floating raft.
|
 Troop #132 made and posted signs near the beach for tree identification.
|
 Troop #650 renovated the East Gate pump platform to help minimize Poison Ivy in the area.
|
 Troop #418 helped finish trails and drainage ditches at West Gate.
|
 Civil Air Patrol Cadets dug drainage ditches at group site to prevent flooding.
|
 Troop #38 - Gravel Crew: Finished graveling the trail to the creek
|
 Troop #38 - Stacking Crew (with Jean Keller): Stacked wood from dozed trees
|
 Troop #19 - Stacking Crew: Stacked wood from dozed trees on East Gate
|
 Troop #19 - Staining Crew: Stained many of the new tables on East Gate
|
 Troop #132: Filled all of the ruts on the road in front of the pavilion
|
 Troop #533: Stained tables and filled lowspots in roadways and trails
|
 Troop #28 cleared brush, graveled the beach trail and stained tables.
|
 Civil Air Patrol Cadets dug a drainage ditch along the hill on Upper West Gate road
|