PBA

Groups at Birch Bend

Photo by PBA camping committee
Troop #49 repaired wash-outs on the Upper East Gate road.

Photo by  PBA camping committee
Troop #116 built culverts and repaired the Swamp Trail at the east end of
West Gate.


Photo by PBA Camping Committee
Troop #28 began the new East gate latrine project and prepared the
East gate road for blading.


Photo by  PBA camping committee
Troop #38 launched and anchored the floating raft.


Photo by  PBA camping committee
Troop #132 made and posted signs near the beach for tree identification.
Photo by  PBA camping committee
Troop #650 renovated the East Gate pump platform to help minimize
Poison Ivy in the area.
Photo courtesy Lloyd Dalton
Troop #418 helped finish trails and drainage ditches at West Gate.
Photo by  PBA camping committee
Civil Air Patrol Cadets dug drainage ditches at group site to
prevent flooding.
Photo by PBA camping committee
Troop #38 - Gravel Crew: Finished graveling
the trail to the creek


Photo by  PBA camping committee
Troop #38 - Stacking Crew
(with Jean Keller): Stacked wood
from dozed trees


Photo by  PBA camping committee
Troop #19 - Stacking Crew: Stacked wood from
dozed trees on East Gate


Photo by  PBA camping committee
Troop #19 - Staining Crew: Stained many of the new tables on East Gate

Photo by  PBA camping committee
Troop #132: Filled all of
the ruts on the road
in front of the pavilion
Photo by  PBA camping committee
Troop #533:
Stained tables and filled lowspots in roadways and trails
Photo courtesy Lloyd Dalton
Troop #28 cleared brush, graveled
the beach trail and stained tables.
Photo by  PBA camping committee
Civil Air Patrol Cadets dug a drainage ditch along the hill on Upper West Gate road


Copyright © 2005 TC Design. All Rights Reserved.